Wednesday, 2 November 2011
AP - Production Log 2/11/11
Today we uploaded all the footage that we shot in london and went through it all to decide which ones would be suitable for our video. We opened up Premier and have started a new project so that we can begin editing. At the moment we have 45 minutes of footage on our timeline, however, we feel that we can cut this down so dramatically that we may not have enough to fill the 3minutes 56 seconds of our song. As a result of this worry we are planning on doing some 'fun' performance shots in the drama studio as fillers. We are still in discussion of this though and hope to finish a plan by the end of this week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment